HOSPITAL WASTE INCINERATOR incineration Secondary Chamberincineration Secondary Chamber

According to the European Waste Incineration Directive, incineration Secondary Chambermust be designed to ensure that the flue gases reach a temperature of at least 1100 °C for 2 seconds in order to ensure proper breakdown of toxic organic substances.

ii. Blower Centrifugal fan (according to manufacturer design) will be provided to inject air for burning waste and gases in Secondary combustion chamber furthermore air regulation and distribution will be automatic and electronically controlled.
iii. Chamber should have electrically operated natural gas burner.
5. Burners
i. Primary and Secondary chamber with electrically operated suitable for natural gas operation.
ii. Regulated automatically for controlling of temperature inside
chambers.
iii. Automatic closing of burners if primary door chamber is not properly closed or opened during time of operation.
iv. Electrical safety to prevent startup of burner unless its shutter is fully opened, and closure of burner shutter when burner is switched off.
6. Waste Feeding System
i. Automatic loading system to minimize user intervention. ii. Auto opening and closing of primary chamber door.
iii. Hydraulic lifter with lifting capacity of minimum 500 kg load to lift waste trolley fixed by user for loading in incinerator.
7. Wet Scrubber / Gas Scrubber
i. Scrubber is air pollution control devices that use liquid to remove particulate matter or gasses from exhaust or flue gas steam. This atomized liquid (water) entrains particles and pollutant gases in order to effectively wash them out of the gas flow.
ii. Scrubber must be very multi-disciplinary with ability to remove solids, mist and gasses simultaneously while also providing cooling.
iii. Water saving system with re-circulating system and cooling tower.
8. Water Treatment System
i. Water treatment unit to treat the water used in Wet Scrubber before opening it into main drain.
ii. System has settling tank with minimum thickness of 3mm

incinerator suppliers
small incinerators
portable incinerator
Tel: +86-25-8461 0201
Mobile: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com
Email: sales@hiclover.com
Email: hicloversales@gmail.com

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes

Leave a comment